• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The slab was subsequently concreted by means of a total of six formwork carriages – constructed using the back-step construction method. The slab was subsequently concreted by means of a total of six formwork carriages – constructed using the back-step construction method.

The slab was subsequently concreted by means of a total of six formwork carriages – constructed using the back-step construction method.

The slab was subsequently concreted by means of a total of six formwork carriages – constructed using the back-step construction method.

Media-ID: 272773
Author/Source:

PERI GmbH

Medium provided by: PERI, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 24/06/2020

More media of this structure

USA (2019)

More media for this product/service available at: