0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Media File No. 272771

The first working section in the tunnel tube: the realization of starter units which form the foundation for the tunnel-in-tunnel. This area is formed with custom steel formwork. The two support areas – one for the rising wall, another for the prefabricated panel which is mounted at the end of all reinforced concrete work and subsequently forms the bottom carriageway slab – are clearly visible.

Media-ID: 272771
Author/Source:

PERI GmbH

Medium provided by: PERI, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 14/03/2017

More media of this structure

USA (2019)

More media for this product/service available at: