0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Media File No. 269333

The walls are formed in advance using "TRIO 330" which is climbed with the help of folding platforms; wall and slab formwork operations as well as the complex construction of the circumferential cantilevered balconies are carried out separately

Media-ID: 269333
Author/Source:

PERI GmbH

Medium provided by: PERI, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 03/12/2016

More media for this product/service available at: