The four support cables were tied back using tensile piles that reach into the load-bearing rock up to a depth of 17 m.

The four support cables were tied back using tensile piles that reach into the load-bearing rock up to a depth of 17 m.

Media-ID: 268118
Medium provided by: DYWIDAG-Systems International, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.