0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

For the construction of the hydroelectric powerhouse, an approx. 30.5 m deep rock excavation had to be built.

For the construction of the hydroelectric powerhouse, an approx. 30.5 m deep rock excavation had to be built.

Media-ID: 260060
Medium provided by: DYWIDAG-Systems International, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 20/07/2016

More media of this structure

More media for this product/service available at: