Media File No. 252274
In the lower cycles the cast-in-place building construction sections open up towards the top before the walls start sloping toward each other again. Large-area formwork Top 100 tec is used for precise fabrication of walls, some of which are 18.00 m high and inclined up to 23.5°
|
More media of this structureMore media for this product/service available at: |