Media File No. 243468
The VARIOKIT formwork carriage ensured rapid concreting sequences for the construction of the new subway station in Seattle. HD 200 heavy-duty props served as temporary support for the longitudinal edge beams.
|
More media of this structureMore media for this product/service available at: |