Media File No. 243252
The 74 meter long, 700 tonne tunnel boring machine "Bärlinde" drilled under the Spree River, on to the Humboldtforum and Spree Canal, below Unter den Linden and onwards to the U-Bahn station at the Brandenburg Gate
|
More media of this structureMore media for this product/service available at: |