Media File No. 243149
Modular shoring assembly: VARIOKIT system components were pre-assembled on the ground to form truss segments and placed into intermediate storage with the crane. Three such segments were subsequently coupled to create a 37 m long truss unit and lifted over the Mur by means of a mobile crane.
|
More media of this structureMore media for this product/service available at: |