Media File No. 242881
PERI supplied a project-specific formwork and scaffolding solution and supported with comprehensive engineering services for the construction of the 108-m-high complex dam on the River Tua in Portugal.
|
More media of this structureMore media for this product/service available at:Other similar media files |