Media File No. 242224
In the foreland area, PERI UP Rosett Flex load-bearing system together with a throughway consisting of HD 200 heavy-duty props was used as shoring solution to support the 207 m long viaduct. Thanks to 25 or 50 cm system grid, the position of the legs could be flexibly adapted to accommodate the respective loads. The aluminium PERI UP Rosett staircases served as safe access means for site personnel
|
More media of this structureMore media for this product/service available at: |