Media File No. 241963
Due to the PERI solution with external CB Climbing Platforms, no facade scaffolding for the shell construction was required. For the circular reinforced concrete walls of the cupola, RUNDFLEX Circular Formwork together with FB 180 Folding Platforms were used.
|
More media of this structureMore media for this product/service available at: |