Media File No. 241962
For the reconstruction of the Berlin City Palace, PERI supplied cost-effective formwork and scaffolding solutions from one source. Apart from short shuttering and moving times, the on-site support provided by the PERI engineers in particular ensured that the tight construction schedule could be maintained.
|
More media of this structureMore media for this product/service available at: |