Media File No. 231756
Head of the S-210 Tunnel boring machine used to excavate the eastern tube of the Gotthard Base tunnel between Bodio and Faido, Canton Ticino, Switzerland (all roll chisels have already been removed, picture taken 10 days after breakthrough into multi-function station Faido, 2000 m of rock overhead, diameter is 8.80 m, length of the TBM is 400 m)
|
More media of this structureOther similar media files |