Media File No. 227040
The new Roche Tower in Basel is climbing to 178 m with MEVA formwork: MAC automatic climbing system, MevaDec slab system MevaDec and Mammut 350 wall formwork.
|
More media for this product/service available at: |
The new Roche Tower in Basel is climbing to 178 m with MEVA formwork: MAC automatic climbing system, MevaDec slab system MevaDec and Mammut 350 wall formwork.
|
More media for this product/service available at: |