0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Media File No. 217616

The custom-designed synchronous system was engineered to push apart and hold the two parts on the top of the arch, leaving the arch totally un-swung. Featuring the highest arch in the world of a fluvial bridge, execution of the project was made possible in large part by the synchronized systems developed by Enerpac's Integrated Solutions centre of Spain

Media-ID: 217616
Medium provided by: Enerpac, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 16/05/2013