Media File No. 217616
The custom-designed synchronous system was engineered to push apart and hold the two parts on the top of the arch, leaving the arch totally un-swung. Featuring the highest arch in the world of a fluvial bridge, execution of the project was made possible in large part by the synchronized systems developed by Enerpac's Integrated Solutions centre of Spain
|
More media for this product/service available at: |