0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Media File No. 217615

The crown jacking of the bowstring arch was done using a synchronous system with six 2000 tons double-acting lock nut cylinders controlled by a single PLC-control unit

Media-ID: 217615
Medium provided by: Enerpac, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 16/05/2013