Media File No. 17778
The construction is divided into 2 x 42 m foreshore bridges and one main bridge section consisting of a 160 m long main span and 2 x 100 m long side spans
|
More media of this structure |
The construction is divided into 2 x 42 m foreshore bridges and one main bridge section consisting of a 160 m long main span and 2 x 100 m long side spans
|
More media of this structure |