Media File No. 17776
PERI Cantilever formwork in the main section of the bridge. Beginning at the piers positioned close to the river banks, the pre-stressed box girder is formed and concreted from both sides with around 80 m cantilever until both halves of the superstructure join over the middle of the river
|
More media of this structure |