Media File No. 17776

PERI Cantilever formwork in the main section of the bridge. Beginning at the piers positioned close to the river banks, the pre-stressed box girder is formed and concreted from both sides with around 80 m cantilever until both halves of the superstructure join over the middle of the river

Media-ID: 17776
Created in/on: 2003
Author: Helmut Schugg (Peri GmbH)
Author/Source:

PERI GmbH

Medium provided by: PERI, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 05/05/2004