Toulnustouc Dam
Using the tie-less GRV system with a radius of 18 ft (5.5 m), PERI was able to provide Aecon with a pre-assembled solution to form the entrance area for a diversion tunnel
|
More media of this structure |
Using the tie-less GRV system with a radius of 18 ft (5.5 m), PERI was able to provide Aecon with a pre-assembled solution to form the entrance area for a diversion tunnel
|
More media of this structure |