Millau Viaduct under construction
The temporary support towers T7 and T6 with in between concrete pillar P7. On ground level of tower T7 the cube structure with the hydraulic pier lifting system is visible. The crane is used to insert new pier segments. The nose recovery system at the front end approaches the temporary tower and will compensate height deviation during deck launching
|