Uptown München
As in the campus buildings, slabs are formed in the high-rise using VT table modules. The climbing protection wall provides a secure working environment even at a height of 140 metres
|
More media of this structure |
As in the campus buildings, slabs are formed in the high-rise using VT table modules. The climbing protection wall provides a secure working environment even at a height of 140 metres
|
More media of this structure |