0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Uptown München

Using ACS climbing units, 1,800 m² VARIO girder wall formwork was raised hydraulically from floor to floor without the use of a crane. The crane-lifted enclosure system ensures maximum level of safety for work on slab edges

Media-ID: 13169
Author/Source:

PERI GmbH

Medium provided by: PERI, image used with kind permission.
Copyright notice / License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Published on:
Last updated on: 01/10/2003

More media of this structure

Germany (2004)