Weald and Downland Museum
Please hold on for a moment! The erection of the timber batten network was carried out on a PERI UP platform over 1,200 m². The sensational building shape was formed by altering the scaffolding. The high flexibility of the PERI UP Rosett system proved itself here
|
More media of this structure |