Proceedings of the Institution of Civil Engineers - v. 70, n. 3 (August 1981)
Published: | August 1981 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
Holroyd, J. J. / Little, A. L. / Dawson, G. M. / Price, V. E. / Jones, K. R. | Design and Construction of the Approach Embankments to the River Trent Bridge on the M180 South Humberside Motorway | 481-499 |
Cavalier, P. G. / Vassie, P. R. | Investigation and Repair of Reinforcement Corrosion in a Bridge Deck | 461-480 |
Slack, J. C. / Giles, R. W. / Banwell, H. | Management Contracting in Civil Engineering | 381-391 |
Thackray, J. E. / Archibald, G. G. | The Severn-Trent Studies of Industrial Water Use | 403-432 |
Needham, F. H. | Site Inspection of Structural Steelwork | 393-402 |
Cooke, R. W. / Sillett, D. F. / Bryden Smith, D. W. / Smith, D. W. B. / Gooch, M. V. | Some Observations of the Foundation Loading and Settlement of a Multi- Storey Building on a Piled Raft Foundation in London Clay | 433-460 |
Evans, J. G. / Braithwaite, T. M. / Goldsmith, D. A. | Widening of the M4 Motorway Between Tredegar Park and Malpas: Design, Traffic Management and Construction | 501-518 |