Proceedings of the Institution of Civil Engineers - v. 52, n. 3 (November 1972)
Published: | November 1972 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
Dawson, H. J. / Lyttle, R. P. T. | Construction of the Inclined Penstocks at Churchill Falls Power Station, Labrador | 379-394 |
Ballard, E. H. | The Control of Resources Required for the Construction of a Civil Engineering Project | 291-304 |
Martin, G. P. / Irvine, K. D. | Graving Dock at Scaramanga, Greece | 269-290 |
Butler, A. A. W. | Long Span Cable Roof Structures | 331-353 |
Rhodes, A. H. | Professional Training and Status of Civil Engineers | 355-378 |
Jones, D. / Stephenson, J. A. | Repair of Entrance Lock at Newport Docks | 395-410 |
Heyman, J. / Padfield, C. J. | Two Masonry Bridges: I. Clare College Bridge | 305-318 |
Heyman, J. / Threlfall, B. D. | Two Masonry Bridges: II. Telford's Bridge at Over | 319-330 |