Proceedings of the Institution of Civil Engineers - Geotechnical Engineering - v. 168, n. 3 (June 2015)
Published: | June 2015 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
Linde-Arias, Emilio / Harris, David / Davis, Andrew | Depressurisation for the excavation of Stepney Green cavern | 215-226 |
Bellato, Diego / Spagnoli, Giovanni / Wiedenmann, Ulli | Engineering and environmental aspects of offshore soil mixing | 267-278 |
Wright, Peter / Skipper, Jackie / Maddison, Simon / Brookfield, James / Moss, Neil | An observational approach to railway tunnel voids grouting | 201-214 |
Shepley, Paul | Optimisation of water injection nozzles to aid pile jacking | 257-266 |
Farrell, Ruaidhri / Terry, David | Pipe-jacked canopy performance at Bond Street, London, UK | 189-200 |
Lim, Jit Kheng / Lehane, Barry | Shearing resistance during pile installation in sand | 227-235 |
Indraratna, Buddhima / Perera, Darshana / Rujikiatkamjorn, Cholachat / Kelly, Richard | Soil disturbance analysis due to vertical drain installation | 236-246 |
Divall, Sam / Goodey, Richard J. | Twin-tunnelling-induced ground movements in clay | 247-256 |