Proceedings of the Institution of Civil Engineers - Civil Engineering - v. 176, n. 5 (May 2023)
Published: | May 2023 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
Roberts, Toby / Preene, Martin / Powrie, William | The changing nature of groundwater control for temporary works | 1-10 |
O’Connor, Sean / McCord, Craig | Designing and implementing temporary works schemes on UK nuclear licensed sites | 1-8 |
Williams, Steve | Embedding integration of temporary works with permanent works on railway projects | 1-8 |
Ascaso Til, Mercedes / Wong, Wilson | Examples of integrating hydraulic equipment into temporary works | 1-12 |
Stotesbury, Andrew | Introduction | 2 |
Chesterton, Douglas / Watford, Michael | Lifting a 183 t concrete digester roof safely and cost-effectively with hydraulic bottle jacks | 1-8 |
Joshua, Rachel / Milward, David | Soft touch temporary works: Westminster Hall roof lantern freestanding access, UK | 1-7 |
Miller, Nathan / Zylstra, Reuben | Temporary works for dismantling steel cantilever truss bridges in the USA | 1-8 |