PCI Journal - v. 46, n. 4 (July 2001)
Published: | July 2001 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
Stráský, Jiří / Navrátil, Jaroslav / Susky, Stanislav | Applications of Time-Dependent Analysis in the Design of Hybrid Bridge Structures | 56-74 |
Harries, Kent A. / Petrou, Michael F. | Behavior of Precast, Prestressed Concrete Pile to Cast-in-Place Pile Cap Connections | 82-92 |
Shahawy, Mohsen | A Critical Evaluation of the AASHTO Provisions for Strand Development Length of Prestressed Concrete Members | 94-117 |
Sturm, Edward R. / Ferreri, Michael | Hopi Health Care Center — An All-Precast Concrete Hospital in the Desert | 44-55 |
Ghosh, S. K. | A Necessary Change in the Seismic Design Provisions of the 2000 IBC | 76-80 |
Yee, Alfred A. | Structural and Economic Benefits of Precast/Prestressed Concrete Construction | 34-42 |