Journal of Construction Engineering and Management - v. 122, n. 4 (December 1996)
Published: | December 1996 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
Shen, Liyin / Lee, Rowson K. H. / Zhang, Zhihui | Application of BOT System for Infrastructure Projects in China | 319-323 |
Cheng, M. Y. / O'Connor, J. T. | ArcSite: Enhanced GIS for Construction Site Layout | 329-336 |
Senior, Bolivar A. | Electrical Construction Foreman Task Scheduling | 363-369 |
Lin, Kuo-Liang / Haas, Carl T. | Multiple Heavy Lifts Optimization | 354-362 |
Ruff, Cynthia M. / Dzombak, David A. / Hendrickson, Chris T. | Owner-Contractor Relationships on Contaminated Site Remediation Projects | 348-353 |
Lorterapong, Pasit / Moselhi, Osama | Project-Network Analysis Using Fuzzy Sets Theory | 308-318 |
Fischer, Martin A. / Aalami, Florian | Scheduling with Computer-Interpretable Construction Method Models | 337-347 |