Journal of Civil Engineering and Management - v. 27, n. 1 (January 2021)
Published: | January 2021 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
Wu, Ping / Jin, Ruoyu / Xu, Yidong / Lin, Feng / Dong, Yiting / Pan, Zhihong | The Analysis of Barriers to BIM Implementation for Industrialized Building Construction: a China Study | 1-13 |
Cheng, Ying-Mei / Kuo, Chiao-Ling / Mou, Chia-Ching | Ontology-Based Hbim for Historic Buildings with Traditional Woodwork in Taiwan | 27-44 |
Zhang, Hong / Yu, Lu | Resilience-cost Tradeoff Supply Chain Planning for the Prefabricated Construction Project | 45-59 |
Tian, Wei / Zhong, Xingju / Zhang, Guangmin / Goh, Yang Miang | Sustainability Analysis of Reused Industrial Buildings in China: an Assessment Method | 60-75 |
Li, Sai / Zhang, Zhongjian / Mei, Gang / Lin, Daming / Yu, Jin / Qiu, Renke / Su, Xingju / Lin, Xuechun / Lou, Chonghua | Utilization of BIM in the Construction of a Submarine Tunnel: a Case Study in Xiamen City, China | 14-26 |