Felsbau - v. 23, n. 6 (2005)
Published: | 2005 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
Petter, Reinhold / Miklautsch, Andreas | Excavation of the Ermenek Headrace Tunnel with an Open Type Hard Rock TBM | 15 |
Rudigier, Günther / Gütter, Wolfgang | Experience of TBM Tunnelling since 1965 by Schneider | 40 |
Extension of Milan's Metro Line 1 | 48 | |
Busillo, Aristodemo / Vizzino, Dario / Grandori, Remo | The Monte Giglio Tunnel in Bergamo (Italy) | 21 |
Leitner, Wolfgang / Schneider, o. Eckart | Operational Modelling of Advance Rates for Tunnel Boring Machines | 9 |
Walter, Andreas / Brasser, Johann Peter / Lemmerer, Johann / Lutz, Helmut | Optimization of the lining segments of a double shell railway tunnel | 35 |
Steiner, Helmut / Edlmair, Gerald / Vergeiner, Ralf | Pipe-Jacking versus Conventional Tunnelling | 27 |
Project Parbati II Presure Shafts | 50 | |
Vienna's first Underwater Subway Station – Constructed by the Freezing Method with Drivage by Cutting | 49 |