e-mosty - v. 2022, n. 3 (September 2022)
Published: | September 2022 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
James, Stephen | Cable-Stayed Pedestrian Bridge in Helsingborg, Sweden | 19-27 |
Markelj, Viktor / Rožič, Dušan / Mlakar, Rok | Design of Footbridges & Case Studies | 28-49 |
Devedzic, Zeljka | How BIM Helped Build the Rize-artvin Airport Bridge in Türkiye | 64-68 |
Röder, Václav | Sky Bridge 721, Czech Republic | 7-18 |
Sobotková, Magdaléna | St. Elmo Bridge, Breakwater and Lighthouse, Malta | 50-63 |