Concrete Journal (JCI) - v. 33, n. 4 (1995)
Published: | 1995 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
Fujii, T. / Tamai, S. / Nishimura, K. / Shimizu, F. | Fc=600 kgf/cm2の高強度コンクリートとSD 490 の高強度鉄筋を用いたサイトPCa部材による高層RC造建物の設計・施工 (Design and Construction of High-rise Reinforced Concrete Building with Precast Reinforced Concrete Members Cast on The Construction Site by High Strength Concrete of Fc= | 45-54 |
Sakai, Etsuo / Daimon, Masaki | セメントのイノベーション (Technical Innovation of Cement) | 6-16 |
Nakane, S. / Koyanagi, M. / Iriya, K. | プレキャスト (PCa) 型枠工法の現状 (The Present Situation of Precast Concrete Permanent Formwork) | 25-34 |
Inoue, M. / Iijima, M. / Sasaki, H. | 中央合同庁舎第6号館赤れんが棟保存改修工事 (Preservation and Rebuilding of No. 6 Common Building (Brick construction) for Goverment Office) | 35-43 |
Mabuchi, K. / Ichikawa, H. / Okuda, Y. / Kato, T. | 新型スリップフォーム工法による複合構造高橋脚の施工 (Application of New Slipform Method For Hybrid Structural High Pier) | 55-61 |
Matsuoka, Yasunori / Hayakawa, Mitsutaka | 鋼管充てん工法 (Placing of Concrete into Steel Tubular Columns) | 17-24 |