Civil Engineering and Environmental Systems - v. 18, n. 4 (October 2001)
Published: | October 2001 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
Sanchez-Silva, Mauricio | Basic Concepts In Risk Analysis And The Decision-making Process | 255-277 |
Carvel, R. O. / Beard, A. N. / Jowitt, P. W. | A Bayesian Estimation Of The Effect Of Forced Ventilation On A Pool Fire In A Tunnel | 279-302 |
Chua, D. K. H. / Kog, Y. C. / Loh, P. K. | A Model For Construction Project Budget And Schedule Performances Using Fuzzy Data | 303-329 |
Elshorbagy, Walid / Lansey, Kevin / Slack, DONALD | Optimal Sizing Of Irrigation Delivery Systems Using A Two-stage Stochastic Programming Approach | 331-362 |