Civil Engineering and Environmental Systems - v. 23, n. 2 (June 2006)
Published: | June 2006 |
---|
Articles in this Issue
Author(s) | Title | Page(s) |
---|---|---|
Altun, S. / Goktepe, A. B. | Dependence of dynamic shear modulus of uniform sands on stress level and density | 101-116 |
Toraño, J. / Rodríguez, R. / Diego, I. / Menéndez, M. | Environmental impact of rock excavation in urban areas: comparison between blasting and hydraulic breaker hammer | 117-126 |
Li, Y. P. / Huang, G. H. / Nie, S. L. / Huang, Y. F. | IFTSIP: interval fuzzy two-stage stochastic mixed-integer linear programming: a case study for environmental management and planning | 73-99 |
Ergonul, Sema | A probabilistic approach for economic analysis of a shopping center in seismic zone | 57-63 |
Chevalier, Lizette R. | Use of optimization to develop a correlation model for predicting residual NAPL saturation | 65-72 |