0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Work Zone Lengths for a Four-Lane Road with an Alternate Route

Author(s): (PhD, Dept. of Civil Engineering, Univ. of Maryland, College Park, MD 20742.)
(PhD, Dept. of Civil Engineering, Univ. of Maryland, College Park, MD 20742.)
Medium: journal article
Language(s): English
Published in: Journal of Transportation Engineering, , n. 10, v. 131
Page(s): 780-789
DOI: 10.1061/(asce)0733-947x(2005)131:10(780)
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)0733-947x(2005)131:10(780).
  • About this
    data sheet
  • Reference-ID
    10634662
  • Published on:
    29/11/2021
  • Last updated on:
    29/11/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine