A Work Breakdown Structure for Estimating Building Life Cycle Cost Aligned with Sustainable Assessment—Application to Functional Costs

Author(s): ORCID
ORCID
ORCID
Medium: journal article
Language(s): English
Published in: Buildings, , n. 4, v. 14
Page(s): 1119
DOI: 10.3390/buildings14041119
Abstract:

The tools used for budgeting in the building design phase are still insufficient to address the life cycle of the building in terms of environmental and cost impacts. The main objective of this research is to define a model for extending existing cost databases to accommodate life cycle sustainability assessment. For this, current classification systems are reviewed and a case study has been analysed using the new approach. To this end, a new system of classification of construction information is proposed for the evaluation of early design costs, when data are scarce and the only information available refers to the gross interior area and the plot. The classification organizes the costs in a similar way to the sustainability assessment in EN-15643. A subcategory has been added for revenue, developer costs, and taxes at all stages of the lifecycle. The resulting classification is applied to the functional elements of a secondary school project. In the case study, construction costs represent 21% while the use stage accounts for 72% in a 100-year lifespan. The results show that, starting from generic cost bases, more complex costs and functional costs can be defined at different stages of the life cycle and adjusted to sustainability assessment standards.

Copyright: © 2024 by the authors; licensee MDPI, Basel, Switzerland.
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10773770
  • Published on:
    29/04/2024
  • Last updated on:
    05/06/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine