0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Wiederanbindung des historischen Hafens Bad Karlshafen an die Weser

„Fertig vor Fristende“

Author(s):
Medium: journal article
Language(s): German
Published in: Bautechnik, , n. 8, v. 96
Page(s): 595-600
DOI: 10.1002/bate.201900039
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/bate.201900039.
  • About this
    data sheet
  • Reference-ID
    10315251
  • Published on:
    28/06/2019
  • Last updated on:
    14/11/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine