0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Why costs overrun: risk, optimism and uncertainty in budgeting for the London 2012 Olympic Games

Author(s):
Medium: journal article
Language(s): English
Published in: Construction Management and Economics, , n. 6, v. 30
Page(s): 455-462
DOI: 10.1080/01446193.2012.668200
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/01446193.2012.668200.
  • About this
    data sheet
  • Reference-ID
    10212956
  • Published on:
    05/12/2018
  • Last updated on:
    05/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine