Which Risk Management Is Most Crucial for Controlling Project Cost?
Author(s): |
Wooyong Jung
Seung H. Han |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Management in Engineering (ASCE), September 2017, n. 5, v. 33 |
Page(s): | 04017029 |
DOI: | 10.1061/(asce)me.1943-5479.0000547 |
- About this
data sheet - Reference-ID
10371628 - Published on:
29/08/2019 - Last updated on:
29/08/2019