When Parallel Schools of Thought Fail to Converge: The Case of Cost Overruns in Project Management
Author(s): |
Aaron Anil Chadee
Xsitaaz Twinkle Chadee Indrajit Ray Abrahams Mwasha Hector Hugh Martin |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Buildings, 27 July 2021, n. 8, v. 11 |
Page(s): | 321 |
DOI: | 10.3390/buildings11080321 |
Abstract: |
This paper investigates the conflicting and contrasting views between two prominent schools of thought (SOT), the conventional project management empirical school and the incoming behavioural and psychological sciences, to explain the cost overrun phenomenon in transportation infrastructure projects. Although theories within these SOTs seem to coexist and are used interchangeably, there exists a widening knowledge gap that leads to conflicting and contrasting ideological views. In this paper, we contend that there is a lack of a cross-fertilisation mechanism to fuse and co-join contemporary theories on cost overruns. This has led to the encapsulation and fragmented adhocracy in theory building. Utilising a critical review approach, this study proposes the concepts of ideological distancing and encapsulation between “empiricism” and “behavioural” SOTs as the focus of analyses for understanding the root causes of cost overruns in project studies. The study showed that the extant debate on cost overruns is limited and divergent, effectively contributing to the problem of continued expansion and non-convergence of theories that maintain parallel identities. This creates a space for inquiry, reflecting, theorising, and debating for the convergence of SOTs on cost overrun research and theories on what can be deemed project knowledge. This paper contributes to extant project studies by identifying the need for convergence and co-joining theories with different epistemes through causal linkages. Consequently, this will improve the public sector’s infrastructure policymaking by exposing the theoretical limitations of the current ad hoc manner and application of project management concepts based on the project professionals’ bounded decision-making rationalities. |
Copyright: | © 2021 by the authors; licensee MDPI, Basel, Switzerland. |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
0.58 MB
- About this
data sheet - Reference-ID
10625740 - Published on:
26/08/2021 - Last updated on:
14/09/2021