0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Weserbrücke Porta -- Die Geschichte einer Weserquerung

Author(s):


Medium: journal article
Language(s): German
Published in: Stahlbau, , n. 5, v. 65
Page(s): 169-179
Keywords:
balanced cantilever method steel bridge construction assembly composite construction orthotropic deck call for tenders head stud connector history of structures steel box girder
Available from: Refer to publisher

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10008670
  • Published on:
    16/08/2003
  • Last updated on:
    14/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine