Waiting Period for Closure Pours in Bridge Widening or Staged Construction
Author(s): |
Y. H. Chai
H. J. Hung |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Bridge Engineering (ASCE), May 2016, n. 5, v. 21 |
Page(s): | 04016006 |
DOI: | 10.1061/(asce)be.1943-5592.0000875 |
- About this
data sheet - Reference-ID
10088178 - Published on:
29/11/2018 - Last updated on:
29/11/2018