Vulnerability Assessment of Prefabricated Component Suppliers in Prefabricated Buildings Based on the Controlled Interval and Memory Method Extended under the Probability Language Terminology Set

Author(s):



Medium: journal article
Language(s): English
Published in: Buildings, , n. 12, v. 13
Page(s): 3070
DOI: 10.3390/buildings13123070
Abstract:

Accurately evaluating the vulnerability of prefabricated components in prefabricated buildings is the basis of scientific management of its supply chain. Thus, a novel vulnerability evaluation method for the suppliers of prefabricated components in the context of prefabricated buildings was proposed in this study. First, a vulnerability evaluation index system was identified and constructed by the pressure–state–response (PSR) model. With the clear logic and strong applicability of PSR, this system, including 18 indexes, was easy to understand and exhibited strong practicability. The weights were then determined via the multiplicative analytic hierarchy process with the expansion of a probabilistic language terminology set (PLTS). PLTS could describe decision information more comprehensively, so the evaluation result is more scientific. Subsequently, the probability of the vulnerability level was superimposed in a parallel bottom-to-top method via the controlled interval and memory (CIM) models, and these were extended by the PLTS. This set handled the uncertain information in the decision-making process more efficiently and accurately, and finally determined the vulnerability distribution. Ultimately, the probability of each vulnerability level was determined by combining the weight information. The reconstruction and resettlement housing construction project of urban shanty towns in the Taohua South Road Community in Xihu District, Nanchang City, was selected as a case study. The case study proves the effectiveness of this method, which has higher resolution and is more convenient for managers to make decisions.

Copyright: © 2023 by the authors; licensee MDPI, Basel, Switzerland.
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10754332
  • Published on:
    14/01/2024
  • Last updated on:
    07/02/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine