0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Vorerkundung und Baufortschritt beim Brenner Basistunnel

Author(s):
Medium: journal article
Language(s): German
Published in: Beton- und Stahlbetonbau, , v. 108
Page(s): 35-42
DOI: 10.1002/best.201380006
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/best.201380006.
  • About this
    data sheet
  • Reference-ID
    10122098
  • Published on:
    20/01/2019
  • Last updated on:
    20/01/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine