Viewpoint. Aligning temporary works with the Digital Plan of Work

Author(s):
Medium: journal article
Language(s): English
Published in: The Structural Engineer, , n. 1, v. 99
Page(s): 39-41
DOI: 10.56330/wuoy9213
Abstract:

Temporary works can often be overlooked at the strategy stage of a project. However, introducing temporary works digitally from the very beginning of a project delivers many benefits, including the ability to help teams win tenders by providing more buildable solutions, argues Duncan Reed of Trimble.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.56330/wuoy9213.
  • About this
    data sheet
  • Reference-ID
    10762762
  • Published on:
    23/03/2024
  • Last updated on:
    23/03/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine