El viaducto del río Ulla en el Eje Atlántico de Alta Velocidad: una celosía mixta récord del mundo
Author(s): |
Francisco Millanes Mato
Miguel Ortega Cornejo Rubén A. Estévez Sánchez |
---|---|
Medium: | journal article |
Language(s): | Spanish |
Published in: | Hormigón y acero, 4th Quarter 2015, n. 277, v. 66 |
Page(s): | 165-190 |
DOI: | 10.1016/j.hya.2015.09.002 |
Abstract: |
Viaduct over Ulla River in the Atlantic High Speed Railway Line: A composite (steel-concrete) truss world recordWith the commissioning of the Atlantic High Speed Railway Line between Pontevedra and A Coruña, in the spring of 2015, the viaduct over the river Ulla has achieved the world record in the typology of high speed composite truss bridge, with three main spans of 225 + 240 + 225 m. This exceeds the Nantenbach Bridge over Main River in Germany, which held the record since its conclusion in 1993 with a 208 m span.This article describes in detail the design and the main features of the viaduct, the new system of quality control of the execution implemented with great success. A description is also presented on the complex and outstanding construction processes used for the execution of the deck of the bridge and the foundation of the piers located on the river, with the exceptional temporary works that have been fabricated ex profeso for the execution. |
Keywords: |
balanced cantilevers double composite action launching steel structure lifting truss
|
Structures and Projects
- About this
data sheet - Reference-ID
10075472 - Published on:
26/09/2018 - Last updated on:
04/11/2018