VfM-at-Risk Analysis Model for Build–Operate–Transfer Infrastructure Projects
Author(s): |
Andreas Wibowo
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Infrastructure Systems, December 2022, n. 4, v. 28 |
DOI: | 10.1061/(asce)is.1943-555x.0000721 |
- About this
data sheet - Reference-ID
10693367 - Published on:
23/09/2022 - Last updated on:
23/09/2022