Using the Network Metaphor to Design, Deliver, and Maintain a Construction Management Curriculum
Author(s): |
Ihab M. H. Saad
|
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering, 2015, v. 2015 |
Page(s): | 1-7 |
DOI: | 10.1155/2015/465493 |
Abstract: |
Construction management programs accredited by the American Council for Construction Education (ACCE) are responding to new standards for accreditation, as the accreditation process itself is being changed to primarily focus on learning outcomes. These changes offer an opportunity and a challenge for existing programs to readjust and restructure to meet the increasingly changing expectations within the construction market. Using a network metaphor, with a critical path consisting of critical activities, activity codes, and constraints, can be a successful methodology to develop/align a construction management curriculum. As with any network, this approach can be used as both planning and control tool, being revisited regularly for further fine-tuning responding to the feedback resulting from assessment efforts to “close the loop.” The resulting network can be presented in both tabular and/or graphical format highlighting the critical path and particular critical activities (learning concepts) within that path. Different resources can be applied to the schedule reflecting their commitment and availability limits (space, labs, computers, etc.). |
Copyright: | © 2015 Ihab M. H. Saad |
License: | This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met. |
1.43 MB
- About this
data sheet - Reference-ID
10177336 - Published on:
02/12/2018 - Last updated on:
02/06/2021